PO-2026-0412
Arrives 15 Sept 2026 — 13 days of float
PO-2026-0412
Raised 4 Sept 2026 · Acme Project
From
Acme Project
Tower 1 — Site Store
Tower 1 — Level 4 reinforcement
To
SteelCo Industries
Vijayawada
4.5 rating, 89% on time
MaterialQtyAmount
TMT Steel Bar — Fe 500D — 16mm
₹61,200 per tonne
Binding Wire — 18 SWG
₹76 per kg
- Subtotal
- ₹11,16,800
- GST
- ₹2,01,024 (18%)
- Total
- ₹13,17,824