InncirclesAcme Project
N

PO-2026-0412

Arrives 15 Sept 2026 — 13 days of float

PO-2026-0412

Raised 4 Sept 2026 · Acme Project

In Transit

From

Acme Project

Tower 1 — Site Store

Tower 1 — Level 4 reinforcement

To

SteelCo Industries

Vijayawada

4.5 rating, 89% on time

MaterialQtyAmount

TMT Steel Bar — Fe 500D — 16mm

₹61,200 per tonne

18 tonnes₹11,01,600

Binding Wire — 18 SWG

₹76 per kg

200 kg₹15,200
Subtotal
₹11,16,800
GST
₹2,01,024 (18%)
Total
₹13,17,824